922 B
922 B
Update References
- Identify the Plan - From the
USER_PROMPT, locate the target plan.htmlfile to update - Identify Related Work - Determine the other plan(s)/doc(s) and the link direction: back reference (work this plan builds on or depends on) or forward reference (work that builds on or extends this plan)
- Update This Plan - Edit the target plan's metadata header, adding the link to
{{BACK_REFERENCES}}or{{FORWARD_REFERENCES}}(relative path + short label) without duplicating an existing reference - Update the Other Side - For each related plan, add the reciprocal reference so links stay bidirectional, then append the current ISO timestamp to
modifiedon every plan touched - Record Amendment - Append a new entry to the Amendments section of each plan touched (newest at the bottom) noting the references added
- Report - List each plan touched and the references added in each direction